Lot 42

Started September · Finished early October

A new two-storey home finished in stucco, started in September and completed on schedule in early October, before the cold weather set in.

Rear elevation of the Lot 42 home with a finished light grey stucco exterior and covered patio, autumn trees behind.

The job

Lot 42 started in September with a clear goal: have the exterior finished by early October, before the cold weather arrived. The crew pushed hard to get there.

The job ran to plan from start to finish. There were no surprises along the way, and the work was completed on time.

The result looks great. The photos below follow the exterior from scaffolding and early coats through to the finished walls.

Scope

  • Started in September
  • Pushed to finish by early October, ahead of the cold
  • Ran to plan from start to finish
  • Completed on schedule

Before

Lot 42 rear elevation mid-project, stucco walls in an earlier coat with the windows taped off in red.

After

The same Lot 42 rear elevation with the finished stucco coat applied.
The rear elevation, mid-project and finished.

Before

Patio corner of the Lot 42 home mid-project, grey stucco with windows masked in red tape.

After

The same patio corner of Lot 42 with the finished light stucco exterior.
The patio corner, before and after the finish coat.
A short walk past the finished rear elevation.
Elevated view of the finished Lot 42 home and rear patio from behind a chain-link fence, pine hillside beyond.
From above, the whole rear of the house in one finish.
Scaffolding along a tall stucco side wall at Lot 42 during application, upper storey still in house wrap.
Scaffolding up on the tall side wall during the push to finish.
Side elevation of Lot 42 with finished stucco on the main level above a stone retaining wall.
The side elevation above the retaining wall.
Front of the Lot 42 home with stucco walls, boarded garage openings and a crew member working on the driveway.
The front, with the garage openings still boarded.